Restricted Hours Noise Monitoring Results -- Daytime on Public Holiday        
Station M5, Chuk Lam Ming Tong                  
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
14-Nov-10 11:35 11:50 Sunny 66 69 54 Ground excavation Traffic noise and noise from the gate closed at Chuk Lam Ming Tong exit N.A 22.8 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
      Min. 66                
      Max. 66                
Restricted Hours Noise Monitoring Results -- Evening time           
Station M5, Chuk Lam Ming Tong                  
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
11-Nov-10 22:45 23:00 Fine 65 58 61 No major construction works Road traffic at San Wan Drive According to contractor, general construction works was in process accordance to CNP. 21.3 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
      Min. 65                
      Max. 65